(1) the horizontal centerline and installation datum line of a stand deviation shall not be greater than + / – 5 mm.
(2) stand center elevation deviation should not be greater than + / – 3 mm.
(3) frame transverse (spindle) levelness of 0.1 mm/m, longitudinal levelness is 0.5 mm/m.
(4) the spindle levelness of 0.1 mm/m.
(5) on the rotor plate hammer, generally should not remove, must remove, should mark according to the factory for assembly.Did not indicate the tag plate hammer before assembly must be matching, plate hammer weight deviation between should comply with the provisions of the equipment technical documents.
(6) between the top of the rotor plate hammer and counterattack plate gap, should comply with the provisions of the equipment technical documents.
(7) if the shell for hydraulic jack, hydraulic system installation shall comply with the provisions of the relevant technical documents.